
『thermal mass flow meter for vent gas|turbine flow meter』Related information(v cone flow meter|rotary gas meter|gallon meter|gear meter|metal tube rotameter|glass tube rotameter|nutating disk meter|transit time ultrasonic flow meter|wedge flow meter|pd meters|hydraulic flow meter|ultrasonic water flow meter|water flow meter|air flow meter|magnetic water flow meter|oxygen flow meter|gas flow meter|argon flow meter|air velocity meter|gasoline flow meter|fuel flow meter|ultrasonic water meter|digital water meter|nitrogen flow meter|solid flow meter|Oxygen tank flow meter|digital water flow meter|diesel fuel flow meter|steam flow meter|02 flow meter|compressed air flow meter|oil flow meter|liquid flow meter)

What is the principle of proximity alignment assay?
2. Translation of the instruction manual h2>
After opening the machine pay attention to maintaining smooth flow of ozone indoors. If there is a malfunction in the gas supply section, the machine should be stopped immediately to prevent heat accumulation in the ozone chamber and damage to the ozone generating components. As part of the failure of gas supply should be immediately shut down to prevent the accumulation of ozone chamber heat, ozone damage to the original. Every day when starting up, the equipment must be checked for air leaks. If there is an air leak, the machine must be stopped and the problem must be resolved before starting up. Device must be checked at boot time every day is leaking, if the leak must be shut down until the problem is resolved in order to boot. Each device installation should leave room for easy disassembly and maintenance, while also being compact and reasonable. The equipment installation should leave room for, both for the demolition and repair, but also compact and reasonable. The entire equipment should ensure smooth air flow (when the valve is controlled, the ozone generator must be turned on and the valve must be opened), and leak proof and anti blocking measures should be taken for each air flow and pipeline. Set of equipment should ensure the smooth flow of gas path (valve control, ozone generator to open, the valve must be opened) and the gas line, pipeline leak need to be taken, aiming to halt the measure. Once you have confirmed that the device has been installed correctly and are familiar with the following content, you can proceed with device operation. When you determine the equipment has been proper



Hot Product
Related AD
